|
|
INDUSTRY PERFORMANCE STANDARDS COMPLIANCE
MANUFACTURER STIPULATES COMPLIANCE WITH
| |
ASTM E 330; DADE COUNTY BUILDING CODE
COMPLIANCE PROTOCOL PA 202
| |
| +76 PSF |
|
-76 PSF |
|
3'-0" X 6'-8" |
|
|
WATER RESISTANCE TEST
| |
ASTM E331; DADE COUNTY BUILDING CODE
COMPLIANCE PROTOCOL PA 202
|
FORCED ENTRY TEST
| |
ASTM F842; DADE COUNTY BUILDING CODE
COMPLIANCE PROTOCOL PA 202 |
IMPACT TEST
| |
DADE COUNTY BUILDING CODE
COMPLIANCE PROTOCOL PA 201 |
CYCLIC WIND LOAD TEST
| |
DADE COUNTY BUILDING CODE
COMPLIANCE PROTOCOL PA 203
| |
| +76 PSF |
|
-76 PSF |
|
3'-0" X 6'-8" |
|
|
NATIONAL STANDARDS OF CANADA
DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
| |
USE OF MATERIALS BULLETIN NO. 89;
AAMA 1702.2 |
FIRE RESISTANCE TEST
| |
ASTM E152; CSFP 43.7;
CAN 4-S104 (ULS S104);
NFFPA 252; UBC 43-2;
UL 10(B); NFPPA 80
90 MINUTE 3'-0" X 6'-8" |
AIR INFILTRATION TEST
| |
ANSI/ISDI 101; NFRC 400; ASTM E283 |
ACOUSTICAL PERFORMANCE TEST
| |
ANSI/ISDI 103; ASTM E90; ASTM E413
STC 26 |
WATER PENETRATION TEST
PHYSICAL ENDURANCE TEST
| |
ANSI A151.1; ISDI 105
LEVEL C |
THERMAL PERFORMANCE TEST
| |
ANSI/ISDI 107; ASTM C236
NFRC 100
0.18 WITHOUT GLASS
0.25 WITH ½" I.G. QTR LT
0.33 WITH ½" I.G. HALF LT
0.42 WITH ½" I.G. FULL LT
|
FINISHING INSTRUCTIONS
| |
FOR DOOR TO BE WARRANTEED, DOOR MUST BE
PAINTED OR STAINED AND TOP COATED WITHIN 30 DAYS |
NOTE: ALL DOORS ARE TO BE ASSEMBLED IN ACCORDANCE WITH PREM-330
NOTE: ALL DOORS ARE TO BE INSTALLED IN ACCORDANCE WITH ANSI/ISDI 102.
FIRE RATING VOID IF GLASS LITES ARE INSTALLED
| Entry Systems |
| 2000557 3/98 |
|
|